On-going Projects

Facilities Management Office Projects On-going Projects

Project Works

Location

Duration

Main Campus

Replacement of Drift Eliminators for Cooling Towers at Block C
C14 roof floor & C13 (temp storage), Block C
2 Feb 2026 to 6 Mar 2026
Replacement of the motor bearing of Lift L1 (temporary suspension)
Block B
2 Feb 2026 to 6 Feb 2026
Annual examination of Lifts L6-L9 (temporary suspension)
Block C
14 Feb 2026
Replacement of the defective urinal sensor at the male toilet on Level 6 (temporary suspension)
Block C
14 Feb 2026
Resurfacing and repair works in outdoor seating area
Block A and B
9 Feb 2026 to 10 Feb 2026

Jockey Club Campus

Installation of Trophy Cabinet
Lift lobby, Level 1
2 Feb 2026 to 31 Jan 2026
Replacement of air curtain
D0G01 Main Entrance Lobby Level 0
8 Feb 2026 

Jockey Club Institute of Healthcare

Annual examination of Lift L17 (temporary suspension)
Block F
7 Feb 2026

HKMU-CITA Campus

Renovation of Teaching Venues and Common Room 
Level 6
2 Feb 2026 to early May 2026